Network Roll Out 

Chinacomm network roll out service strictly adheres to the network planning and network roll out project plan, ensuring the quality of the implementation of network roll out. At the same time, it coordinates the network cut over and works on BTS trouble shooting, to facilitate the hand-over after network cut over and ensure the in-time conducting of network maintenance and optimization, thus allowing the operator to provide a network with stable quality to the subscribers. Chinacomm network roll out service includes switching installation and testing, base station installation and testing; and initial tuning services.

Switching installation and testing
Major works of switching installation and testing include three portions, namely, hardware installation, local testing and on-line testing.

Hardware installation including installation of switch cabinet, power supply installation, grounding line distribution, signal line connection and installation of various electric circuit boards.

Local testing includes powering to all modules of system; loading hardware testing data; finding and resolving problems on hardware; and testing the function of system.

On-line testing includes uploading network data, network access testing, finding and resolving problems occurred, observing operation quality of the equipment, and resolving problems during the preliminary stage of operation.

Base station installation and testing
Major works of base station installation and testing include three portions, namely, hardware installation, local set testing and on-line testing. Hardware installation include installation of indoor equipment of mobile communication base station; mounting of outdoor antennas and feeders; installation of power supply equipment of mobile communication base station; mounting of transmission device and environment monitoring device. Local testing includes verification of working status of all components in base station; correctness of hardware configuration and parameter setting; eliminating warning of all modules; and finding and resolving problems in hardware. On-line testing includes download of data; putting equipment into operation; testing the quality of the installed equipment; and resolving problems occurred during the preliminary stage of operation.

Initial Tuning
Initial tuning includes doing drive test right after the network cutover; finding problems on network quality in time; collecting statistical data of network performance after cut over and collecting of subscriber complaints; evaluating and analyzing of network quality; checking and verifying radio network frequency planning and neighboring cell definition. It also includes BTS troubleshooting in coordination with network cut over, to ensure that the network is basically in conformity with the one designed. It also includes ensuring of no obvious quality problem in existence, well working base stations, proper handover between cells and stable network performance.